Rota Design Limited - total engineering solutions  
total engineering solutions . . . .

our company . . .

prevention of failures I . . .

the 5 cu m septic tank figure 1: the 5 cu m septic tank.

Continuing on in our series of articles with the theme “prevention of failures during service of structural plastic products” and in particular, underground tanks and chambers, in this article we appraise some of the common test methods applied to these products.

During the Nordic ARM conference held in Horsens, Denmark in February 2011, Martin and David, directors of Rota Design Limited, presented a case study involving the failure of a 5 cubic metre underground rotationally moulded PE septic tank. The tank didn’t fail, it imploded within hours of installation and many more followed. We presented the analysis of 100 projects taken a random from our files, which had been undertaken during recent years, and that alarmed us so much, it inspired us to write this series of articles.

home page
about Rota Design
contact us
Worldwide

our skills and expertise . . .
engineering design
rotational moulding design
design verification and FEA
artistic modeling
support services

some explanations . . .
rotational moulding
finite element analysis
editorials and articles
patents

further information . . .
client log-in area
confidentiality
website use policies
our copyright
jobs at Rota Design
Rota Design Limited
 
© 2003 - 2014 - Rota Design Limited - all rights reserved - web design by Rotamania